88 YJ-CJ Painting Prep Work and Front Grill

There's been some traveling, so I haven't made a ton of progress over the last couple of weeks.  A few different things are going on:
  • Cleaning and painting some small parts
  • Cleaning up the interior and getting it ready to paint
  • Front Clip - still lots to do

Painting Prep Work

It's time to do another round of painting, so I did quite a bit of prep work recently.

Primed Parts

Epoxy Primed:
  • Tire Carrier Brackets - 5 pieces
  • Tailgate Hinges - pair
  • Windshield Hinges - pair
  • Battery Box - the mods done earlier needed to be touched up

This is a a horrible picture, but it does show all of the primed parts:

Also shown in the picture - the grill and tire carrier.  I worked on the grill paint prep a little today, but much more needs to be done.
 
No action, but I was thinking about how I want to attack the tire carrier.  I may just drop it off at the powder coater and have them sand blast and coat it.  It's an odd shape with lots of area and would take me a long time to clean it up.   

Unfortunately, I forgot to prime the shifter cover and frame today.  I left them out of sight, sitting on a stool.  Doh!


Interior Tub Cleaning

I spent most of the afternoon cleaning the interior of the tub.  I had removed most of the undercoating a few months ago, but had not prepped it for paint.

There's still a long way to go, but I made some progress. 


 It was actually fairly comfortable working under the Jeep "safari" top.  There was ample shade and a slight breeze this afternoon.  There's a lot of actual area that has been cleaned, but that was the easy part.  The difficult corners and seams still need a lot of attention.  

It's been a while since Chase made an appearance!  He was a big help getting the nooks and crannies cleaned up!



Front Grill

This area will be mostly hidden, but I wanted to fill in the notched corners of the grill.  


Patch piece rough shape:

Starting to weld:

More welding and grinding smooth - (more was needed):

Both sides done:

Much more work will be done on the grill/radiator/shroud in the coming days