88 YJ-CJ Miscellaneous Update

Lots of little tasks getting done...a big push is to get the engine sealed up.  Sniper EFI installed and heater hoses installed:


Throttle Cable and Accelerator Pedal installed. 

Throttle cable shown.  

The TH350 kickdown cable was also installed, but I didn't snap a picture of it. (The TH350 is an old transmission with a mechanical kickdown cable attached to the throttle linkage.)


I got the grill and tailgate sandblasted and got some epoxy primer on both parts:


I finished up the steering column assembly on one of the colder days:


I also did some needed maintenance on my car hauler:
  1. Four new tires
  2. replaced a rotten deck board (with a major assist from my trusty sidekick!)
  3. re-stained the deck
  4. replaced the breakaway battery



I did some interior coating removal during a warm day (the stripper works better in warm weather):

Stripper laid down and covered with Saran wrap:

After letting the stripper do its thing for 24 hours, then scraped with a putty knife:

Entire floor after stripping and scraping:

I attacked the final wheel well with the oscillating tool"


As it sits today.  Still some work to be done, but there's light at the end of the tunnel!  Of course, I'll also fix the hole in the floor.